Seal Maker – Extension
Pöttelsdorf
2010
The existing Seal Maker Headquarters from 2004 have been expanded by two new wings, which comes up to a doubling of the total area. The existing wing is linked to the new middle and storage wings via locks in the central axis, which enables an efficient circulation and a consistent continuation of the architectural concept. The new structural volumes follow the existing general design and interpret it according to their functionality.