Seal Maker – Extension

Pöttelsdorf
2010

Seal Maker - Extension - entrance situation

The existing Seal Maker Headquarters from 2004 have been expanded by two new wings, which comes up to a doubling of the total area. The existing wing is linked to the new middle and storage wings via locks in the central axis, which enables an efficient circulation and a consistent continuation of the architectural concept. The new structural volumes follow the existing general design and interpret it according to their functionality.

Seal Maker - Extension - lock and central wing

Seal Maker - Extension - storage building

Seal Maker - Extension - courtyard

Seal Maker - Extension - concept